[Insert Weight of Heaviest Part in Tonnes] 2. Roles and Responsibilities
In most cases, dismantling a top-slewing tower crane requires a mobile assist crane. The method statement details the specifications of the assist crane, including its capacity, boom length, and the exact location where it will be positioned. 5. Step-by-Step Dismantling Procedure
Unbolt the base mast section from the foundation anchors, crucify base, or chassis travel gear.
Rig the assist crane to the main jib using a certified lifting beam and slings hooked into the manufacturer’s specified lifting points. tower crane dismantling method statement
Establish a rigid physical cordon at ground level to prevent unauthorized access to the fall zone. 4.2 Assist Crane Selection
Any site-specific space restrictions or proximity to nearby buildings.
The site is cleared of debris and inspected to ensure it is returned to its original condition. [Insert Weight of Heaviest Part in Tonnes] 2
A is a critical, detailed document that outlines the safe and systematic procedure for taking down a tower crane after project completion. Dismantling is often considered more hazardous than erection due to the fatigue of the team, potential changes in site conditions, and the need to manage loose or worn components.
Operates the assist crane in strict accordance with signals and load charts.
Before any structural bolts or pins are removed, the following preparatory steps must be completed: Establish a rigid physical cordon at ground level
A: Because each step presents unique risks: working at height, heavy lifts, overhead hazards, and confined drop zones. A short statement is a dangerous statement.
A is a formal, written document that details exactly how a specific task or operation will be carried out safely and efficiently. For tower cranes, it breaks down the dismantling process from start to finish. It outlines the sequence of events, the equipment required, the personnel involved, and the specific hazards and risk mitigation strategies associated with the job.