Depending on the generation of your QRU unit, specific internal capacitors or firing modules must be replaced or electronically reset via the ABB service tool.

directly to the switchgear frame, accounting for short‑circuit forces. The box is then connected to the main busbar via copper bars that must be sized and torqued correctly. abb+ufes+manual

The heart of the UFES is the U1 type primary switching element. When a fault is detected, the PSE executes the physical closure. It is a vacuum-based interrupter designed for extreme reliability. When triggered, the UFES closes all three phases to ground simultaneously, effectively eliminating the arc voltage. Each PSE is similar in size to a 24 kV rod insulator, measuring approximately 137 mm in diameter and 210 mm in height. Depending on the generation of your QRU unit,

Measure the resistance of the trip loop (ensure the system is safely isolated first). The heart of the UFES is the U1

Proper installation is critical to ensure the ultra-fast operation of the UFES system. Always refer to the specific engineering drawings provided in your ABB UFES manual, but the standard workflow includes the following phases: Mechanical Mounting

Wiring the QRU requires precision. Incorrect auxiliary wiring can blind the system or cause a false discharge of the pyrotechnic actuators. Optical Sensor Placement

Keep in Touch

Contact Info

Dubai Media City, Dubai, UAE P.O. Box 502887 Shatha Tower, Office 2920 +971 4369 5676
Riyadh, Saudi Arabia P.O. Box 858 Riyadh 11421 Al Muruj, Olaya Street, Alhayat Center Building B, Office 07 +966 112 006 056  
Go to Top